Строительные материалыCondor#Condor#Construction site equipment and machinery#Scaffolding#Shoring for excavation and channels#Construction
CONDOR - Система ГД 600
Trench shoring is a provisional system aiming at supporting excavation walls inside which works are performed relating to sewage and pipeline of several types.
The European standard EN 13331-1/2 (and the italian D.lgs 81/2008) requires that, for excavations deeper than 1.50 m, reinforcements must be applied in order to prevent excavation walls from collapsing and avoid any danger for the operators.
CONDOR trench shoring systems are designed to meet high safety standards during excavations, thus saving time and money.
CONDOR offers two types of trench shoring, depending on the characteristics of the excavation and the soil:
- MA System
- GD600 SystemTrench
GD600 is a trench shoring system to protect excavation and canalization works up to 6,00m depth and 5,00m width.
The system is made up of standard 3.00m x H=2.00m panels which pass along a double guide. The connection system is made up of spacers including sideshift elements.
The double guide allows the positioning of connecting spacers at a specific height, thus facilitating excavation and pipe+ installation operations.
The system was designed for intallation of large size elements, ensuring safety, productivity and flexibility.
The system is designed to withstand a pressure up to 45 kN/sqm.
Further info from manufacturer on System GD 600 Condor